Electrical
Subcontractor is responsible for providing the following:
- Temporary power and lighting
- Install all conduit, boxes and supports for all electrical circuits
- Install all wire, switches and receptacles
- Install conduit and wire to HVAC
- Install electrical panels per plans
- Install breakers
- Install breaker lockouts for breaker called out on plans
- Install junction box above the ceiling for all lighting controlled by Venstar. Wires should pass through JB to panel
- Install light fixtures
- Install grounding
- Rough in for low voltage systems
- Install low voltage cable tray
- Feeder cables for electrical distribution equipment as shown on the one line diagram
- Include 100’ of conduit and cable for underground service
- Light pole bases and conduits
- Lightning protection
- MC type cable used throughout the project
- Conduit stub for data/telephones (wiring and install by others)
- Conduit run for street sign
- Doorbell and horn for receiving door
- Electrician is responsible for compaction of Their trenches on and off the building pad
- Electrician is responsible for providing the necessary equipment to install underground electrical per the plans
- Daily Cleanup of trades’ trash and material
- ALL LIGHTING FIXTURES ARE SUPPLIED BY THE GENERAL CONTRACTOR ON FAMILY DOLLAR PROJECTS
- VENSTAR WILL BE PROVIDED AND INSTALLED BY OTHERS